Sleeve woes
It takes a LONG time to knit sleeves on size 3 needles! So far, this sweater on such small needles didn't seem much slower than anything else I've made, but now I am starting to feel the burn. Here's what I have so far:
I wasn't going to bring these sleeves with me on my three day trip to Tokyo because my back still hurts and I have successfully gotten all clothes and necessities into one small backpack (sock knitting included). But just tonight I realized that I am already going to be at The Pink Cow on Tokyo SnB night. How could I miss it?! Do I cram my sleeves-in-progress into the bag too, or do I just show up with my sock? What a dilemma!


Comments
Three days...a small backpack? Whoa!
Posted by: Mom | June 5, 2005 10:55 PM
Wow, the sleeves look great! And I'm complaining about my clapotis on size 3's! Have a great Tokyo trip.
Posted by: sarah b. | June 6, 2005 01:06 AM
have great trip. those sleeves are lookin' good!
Posted by: froggy | June 7, 2005 01:03 AM
Dang, those sleeves look AWESOME. Take em with ya!
Posted by: Carrie | June 8, 2005 11:59 PM
Hey Molly! Thanks for stopping by the Pink Cow, it was great to meet you and I hope you come back again (w/o your knit-dissing peers!). Okinawa looks super gorgeous, I could use a nice sandy beach right now...
Posted by: Rae | June 14, 2005 10:25 AM
I'm glad to know I am not the only one feeling like it is taking forever to knit up the sleeves. Everytime I bring them out to knit it seems like they are the same length as the week before.
Posted by: Tess | June 22, 2005 02:47 AM